| | Project Description:
Reconstruction and widening of a 5 lane section of US HWY 218 through downtown Keokuk. Project includes storm sewer improvements, right-of-way restoration, traffic control/phasing for construction, pavement markings, pavement widening and new traffic signalization systems at selected intersections.
The existing highway paving was determined to have deteriorated to the point where it was necessary to replace the existing asphalt and brick pavement with a new 10” PCC surface over a 12” aggregate base. Also to improve traffic flow a new center left turn lane was added and driveways were reconstructed. | |